TRILITY BD Newsletter December 2024

Welcome to interactive presentation, created with Publuu. Enjoy the reading!

Click here to return to contents

TRILITY news

Newsletter for TRILITY Group and Joint Venture clients

TRILITY Modular Solutions completes

refurbishment project in Western Australia

In January, TRILITY Modular Solutions completed the Safety Chemical

Dosing Equipment Refurbishment project for a Water Treatment Plant in

Western Australia.

To improve operation of the plant, the project entailed the design,

manufacturing and installation of:

a new sodium hydroxide (caustic) dosing skid

new instruments on the sodium hydroxide storage tank including

-

a new hydro-static level instrument

-

a magnetic level gauge to improve the efficiency of operating

the site

Sodium Hydroxide Unloading Panel

What made this job unique was that the team completed the on-site

construction and commissioning phase of the project with no interruption

to the water treatment plant or the end customer. The temporary dosing

arrangement was a combined effort between TRILITY and the client which

was successful in keeping the plant operational while the upgrade projects

were installed and commissioned.

An outstanding effort by everyone involved.

Existing sodium hydroxide load in panel

TRILITY installed sodium hydroxide load in panel

Existing sodium hydroxide dosing cabinet

TRILITY installed sodium hydroxide dosing skid

Made with Publuu - flipbook maker