Click here to return to contents
TRILITY news
Newsletter for TRILITY Group and Joint Venture clients
TRILITY Modular Solutions completes
refurbishment project in Western Australia
In January, TRILITY Modular Solutions completed the Safety Chemical
Dosing Equipment Refurbishment project for a Water Treatment Plant in
Western Australia.
To improve operation of the plant, the project entailed the design,
manufacturing and installation of:
•
a new sodium hydroxide (caustic) dosing skid
•
new instruments on the sodium hydroxide storage tank including
-
a new hydro-static level instrument
-
a magnetic level gauge to improve the efficiency of operating
the site
•
Sodium Hydroxide Unloading Panel
What made this job unique was that the team completed the on-site
construction and commissioning phase of the project with no interruption
to the water treatment plant or the end customer. The temporary dosing
arrangement was a combined effort between TRILITY and the client which
was successful in keeping the plant operational while the upgrade projects
were installed and commissioned.
An outstanding effort by everyone involved.
Existing sodium hydroxide load in panel
TRILITY installed sodium hydroxide load in panel
Existing sodium hydroxide dosing cabinet
TRILITY installed sodium hydroxide dosing skid